Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • The power plug should be firmly seated in the bottom rear outside the unit.

  • If using a UPS, please ensure it's turned on and rated to handle at least 200VA. 

  • An external power switch is located next to the external power plug. Make sure the switch is on.

...

Find the power switch on the mainboard inside and ensure that it is “ON”

...

.

...

Tip

Notify General Bytes via email that you've received your machine.

  • Request a GB Operator Partner account if you don’t already have one.

  • If anything in the shipment looks wrong or missing,

    • describe it with as much detail as possible, and

    • send a picture with that email.

...

Tip

NEXT: you'll receive in an email reply from General Bytes, your:

  • current installation manuals,

  • a factory default Admin QR Key code.

Warning
  • STOP! Do not proceed until you have all necessary items:

    • the factory default Admin QR Key code,

    • Internet access for the BATM,

    • access to a Crypto Application Server (CAS).

      • If this is your first BATM, please see: Getting Started

      • Your Terminal should be setup in CAS before connecting it to the Internet.

...

2. Setup your BATMTwo in CAS.

The BATM should be setup & ready in CAS before you attempt to connect the BATM to it.

Warning

STOP!

You cannot proceed to the next step (3) until you have:

  • received the factory default Admin QR Key code from the Sales department,

  • Internet access available for the BATM.

...

3.

...

Finally: Connect your BATM to CAS.

Make sure you’ve completed the previous step (Step 2) before connecting the BATM to a network.

...