...
The power plug should be firmly seated in the bottom rear outside the unit.
If using a UPS, please ensure it's turned on and rated to handle at least 200VA.
An external power switch is located next to the external power plug. Make sure the switch is on.
...
Find the power switch on the mainboard inside and ensure that it is “ON”
...
.
...
Tip |
---|
Notify General Bytes via email that you've received your machine.You cannot proceed to the next step without the key information that follows in a reply.
|
Assuming the unit is completely undamaged, wall-mount the BATMTwo using the included mounting template, or seal the mounting holes.
If using a BATM stand, assemble it & attach now. See: Stand Assembly
YOU'RE NOW FINISHED UNPACKING THE BATMTwo.
Tip |
---|
NEXT: you'll receive in an email reply from General Bytes, your:
|
Warning |
---|
|
...
2. Setup your BATMTwo in CAS.
Create the new Terminal in CAS (if missing).
The BATM should be setup & ready in CAS before you attempt to connect the BATM to it.
Warning |
---|
STOP!You cannot proceed to the next step (3 |
...
) until you have:
|
...
3. Finally: Connect your BATM to CAS.
Make sure you’ve completed the previous step (Step 2) before connecting the BATM to a network.
...