Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Shipping the AKAREL7 for service:

1. Remove the

...

USB, power, DB9, and WiFi cables.

The attached DB9 cable (#5) services an MEI/ CPI acceptor. Two thumbscrews hold the DB9 connector in place (turn counter-clockwise to loosen). They should be only hand-tight (no tools required) - but on occasion they may require pliers to initially loosen them.

...

2. Remove the four mounting nuts:

...