Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Dint (mark) the holes with a center punch. This step is critical, please follow these recommendations.

    1. Do not yet perforate the side.

    2. Compare the dint location to the drilling template.

    3. If you can see bare metal while looking perpendicularly through the drilling template, you are in the correct spot. Proceed.

...

  1. Drill holes into the marked positions.

    Use the dints to guide the final drill locations (7mm bit recommended)

    a 7mm hole into each dint after verifying their proper positioning.

Note

Cover any internal electronic devices (e.g. acceptor) from the metal burrs that may fall into them. Failure to do so may result in short circuits and electronics damage!Use a vacuum cleaner to remove any debris before applying power.

...

  1. Drill a hole for the cable.

...

  1. Attach the assembled enclosure while simultaneously threading the cables into the BATM.

...

  1. Secure the enclosure to the BATM with the provided M5 screws.

...

  1. Route the cables as necessary, considering the location of your router.

    1. Pay attention to the components attached to the top door.

    2. Carefully close the top door to ensure you are not pinching any cables.

Hardware installation is completed.

...